Wall-mounted home EV charger with an isolator switch and coiled charging cable on a dark weatherboard wall
Frankston · EV Charger Installation

EV Charger Installation Frankston

A home charger on its own circuit from the switchboard. Tesla Wall Connector, Evnex, or the charger that came with the car. 7 kW single-phase for most homes, 22 kW where the house has three-phase. Switchboard checked first. Fixed price before we start.

  • 4.9 Google Rating
  • Licensed & insured

Tell us about the car and the parking spot

Pick any
Your details
  • Most homes 7 kW single-phase
  • Three-phase homes Up to 22 kW
  • Certificate COES supplied

★★★★★

“I would recommend Streamline to anyone putting on solar panels coupled to a battery. Nick and his experienced team of three work closely together to get the maximum benefit for the customer and readily offer advice on any aspect of the installation before and after. Excellent workmanship. Graeme Black Rock.”

Graeme Mee, Google review Read it on Google

The job starts at the switchboard

A 7 kW charger pulls 32 amps for hours at a time. That is more than any other appliance in the house, so it gets its own circuit from the switchboard with its own safety switch. It does not share with the garage power points.

Before anything is bought, we look at your board. If it has no spare way, or still has ceramic fuses, or the mains from the street are undersized, we tell you and price the board work with the charger. Then we mount the charger where the car parks, run the cable, test it on your car and give you a Certificate of Electrical Safety.

We install across Frankston, the Mornington Peninsula, Cranbourne and the south-east. Fixed price after we have seen the board.

What's in an EV charger installation

  • Switchboard check

    Capacity, spare ways and the state of the mains, before you buy a charger.

  • Dedicated circuit

    Cable sized for 32 amps and the distance, from the board to the charger, shared with nothing.

  • Safety switch

    Its own RCBO on the board. A fault at the charger trips one circuit, not the house.

  • Mounting

    Garage, carport or outside wall, where the lead reaches the charge port without stretching.

  • Isolator

    A switch beside the charger, so it can be turned off without a trip to the board.

  • Test and certificate

    Circuit tested, RCD trip time recorded, charger run on your car, Certificate of Electrical Safety in your name.

Installs we do most

Six situations cover most of the EV charger jobs we do.

  • Streamline electrician wiring a wall-mounted unit beside a switchboard on a garage wall

    Garage chargers

    The most common job, and the shortest run when the switchboard is on the same wall.

    • Charger mounted beside where the car parks
    • Cable clipped or in conduit along the wall
    • Isolator within reach of the charger
    • New circuit added to the board schedule
  • Home EV charger with its isolator and coiled charging cable mounted on a dark weatherboard exterior wall

    Carport and outside walls

    Outdoor mounting. The charger and every connection has to take the weather.

    • Outdoor-rated charger, sealed connections
    • Mounted clear of the car door swing
    • Cable holster so the lead stays off the ground
    • Conduit sealed where it enters the wall
  • Two Streamline electricians walking from their vans on a residential street

    Driveways and long runs

    The car parks a long way from the board. The cable run is most of the job.

    • Route planned at the quote: roof, wall or underground
    • Cable sized for the distance, not just the charger
    • Trenching and conduit priced in the quote
    • Charger placed so the lead reaches the charge port
  • Wall-mounted EV charger with its charging cable coiled on a holster below it

    Your own charger

    The charger came with the car or you bought it online. We install it if it meets Australian standards.

    • Send us the make and model before the day
    • Checked against your switchboard first
    • Installed to the maker’s instructions so the warranty holds
    • Run on your car before we leave
  • Upgraded switchboard with new circuit breakers and RCBOs at a Langwarrin home

    Switchboard first

    The board is full, or still on ceramic fuses. The upgrade is the first half of the job.

    • Capacity and spare ways assessed before you buy the charger
    • Consumer mains checked and flagged if undersized
    • Board and charger done in one visit where we can
    • Room left for solar, a battery or air conditioning later
  • Solar inverter, home battery and wall-mounted EV charger installed on a garage wall

    With solar and a battery

    Charging from the roof. The charger is planned with the inverter and battery, not bolted on after.

    • Charger beside the inverter and battery where they share a wall
    • Circuit planned with the solar system
    • Solar charging set up on chargers that support it
    • Solar, battery and charger quoted together if you want the lot

Which charger

The three questions we get asked, answered before the quote.

7 kW single-phase
The standard home charger. About 40 km of range an hour. Fills most cars overnight
22 kW three-phase
Needs three-phase supply to the house. Most cars take 11 kW at most on AC, so check the car before paying for 22
Tesla Wall Connector
Single-phase 7 kW or three-phase 22 kW. Charges any EV with a Type 2 port, not only Teslas
Evnex
Single-phase 7.4 kW. Solar charging built in: it charges from your excess solar when you tell it to
Your own charger
Installed if it meets Australian standards. Send the model before the day
Price
Fixed, after we have seen the board and the parking spot

Signs the switchboard needs sorting before the charger

Check these before the car is delivered.

  • The board still has ceramic fuses
  • There is no spare way on the board for a new circuit
  • Circuits already trip when a few big appliances run at once
  • An induction cooktop, a split system or solar went in and the board was not touched
  • The consumer mains are old and undersized
  • The only power in the garage is one power point on a shared circuit

What's in scope

Included

  • Switchboard check and a fixed written quote
  • Dedicated circuit from the board to the charger
  • Individual RCBO and an isolator at the charger
  • Charger mounted, connected and run on your car
  • Circuit testing and RCD trip time recorded
  • Certificate of Electrical Safety

Not included

  • The charger itself, unless you ask us to supply it
  • Switchboard or consumer mains upgrades, quoted separately once assessed
  • Trenching, patching and painting where a run goes underground or through a finished wall
  • Solar or battery equipment, quoted as part of a solar and battery job

How the job runs

  1. Step 1: Site visit

    We look at the switchboard, where the car parks and the route between them.

  2. Step 2: Fixed quote

    Charger install, plus any board work needed first, priced together in writing.

  3. Step 3: Cable run

    Circuit run from the board to the charger, in conduit or clipped.

  4. Step 4: Mount and connect

    Charger fixed to the wall, isolator fitted, circuit connected to its own RCBO.

  5. Step 5: Test and hand over

    Circuit tested, RCD verified, charger run on your car, certificate issued.

What we install to

Wiring an EV charger is prescribed electrical work. A licensed electrician does it and you get a Certificate of Electrical Safety in your name. Keep it. Your insurer may ask for it, and charger makers will not honour a warranty on a unit wired by someone unlicensed.

  • Installed to the current AS/NZS 3000 wiring rules
  • Dedicated circuit, cable sized for the current and the run
  • Individual RCBO, trip time measured and recorded
  • Isolator at the charger
  • Outdoor-rated charger and fittings where it lives outside
  • Certificate of Electrical Safety in your name

Why choose Streamline

  • Board checked first

    You hear about any board work before you buy the charger, not after.

  • Tesla, Evnex or yours

    We install the two we know best and the one you already own.

  • Charger with the solar

    Solar, battery and charger planned together if you are doing the lot.

  • Priced after we look

    We look at the board, the parking spot and the run between them, then give you one fixed price.

EV charger installation for Frankston, the Peninsula and Cranbourne

Streamline Electrical & Data is a Frankston-based team working across the Mornington Peninsula and the south-east. EV chargers are a growing part of the week, and most of them come with a switchboard conversation.

7 kW or 22 kW

A 7 kW single-phase charger is what most homes get. It adds about 40 km of range for every hour on charge, so a car that comes home with a quarter of a battery is full by morning. A 22 kW charger needs three-phase supply to the house, which most homes around Frankston do not have, and most cars take 11 kW at most on AC. If you have three-phase and a car that can use it, we will say so. If not, 7 kW is the right buy.

Tesla Wall Connector, Evnex, or the one you have

The Tesla Wall Connector charges any EV with a Type 2 port, not only Teslas, and comes in single-phase and three-phase versions. Evnex chargers are built for homes with solar: they charge from your excess solar during the day and from the grid at night. A charger that came with the car, or that you bought online, is fine to install if it meets Australian standards. Send us the model before the day.

Why the switchboard comes first

Houses through Frankston, Seaford and Carrum Downs often have a board with no spare way, or ceramic fuses with no safety switch at all. Some have consumer mains too small for a 32 amp load on top of the house. We check at the quote. If the board needs work, you get one price for the board and the charger together, and we do them in one visit where we can.

Garage, carport or driveway

The charger goes where the car parks. A garage near the board is the simplest run. A carport or outside wall means an outdoor-rated unit and sealed fittings. A driveway far from the board is mostly a cabling job, through the roof or underground, and we plan the route at the quote. If we are already running cable outside, a sensor light or a camera over the driveway goes in on the same visit.

Cranbourne and the Peninsula

We install chargers in Cranbourne, Clyde and Clyde North as well as Frankston, Mount Eliza, Mornington and the rest of the Peninsula. Same basis everywhere: we look at the board, then quote.

Charging from your own solar

If you have solar or are planning it, say so at the quote. The charger goes beside the inverter and battery where they share a wall, and the circuit is planned with the solar system. Households going all-electric often do the charger and an induction cooktop together, since both need a dedicated circuit.

Frequently asked questions

Do I need a new circuit for an EV charger?
Yes. A 7 kW charger pulls 32 amps for hours. It gets its own circuit from the switchboard with its own safety switch.
Will my switchboard handle an EV charger?
Often. Not always. Older boards run out of room, ceramic-fuse boards have no safety switch, and some consumer mains are too small. We check at the quote and tell you before you buy the charger. If the board needs work, we do the board and the charger together.
7 kW or 22 kW?
7 kW for almost every home. It fills most cars overnight. 22 kW needs three-phase supply to the house and a car that can take more than 11 kW on AC, and most cannot. We tell you which you have.
Do you install Tesla Wall Connectors?
Yes. The Wall Connector charges any EV with a Type 2 port, not only Teslas. We install the single-phase and three-phase versions.
Do you install Evnex chargers?
Yes. Evnex chargers charge from your excess solar during the day, which suits homes with solar.
Can I supply my own charger?
Yes, if it meets Australian standards. Send us the make and model when you book so we can check it against your board and bring the right gear.
Can I charge from a normal power point?
The lead in the car will charge from a 10 amp power point at about 2 kW, roughly 10 km of range an hour, on a circuit that was not built for hours of load. A wall charger on its own circuit is three to four times faster and safer.
Will the charger use my solar?
Evnex chargers charge from excess solar automatically. Others charge on a schedule you set for the middle of the day. Tell us at the quote and we set it up.
Do you install EV chargers in Cranbourne?
Yes. Cranbourne, Clyde and Clyde North, as well as Frankston and the Mornington Peninsula.

Book an EV charger install

Tell us the car, the charger if you have one, and where it parks. We check the board and give you one fixed price.